Jochem Verbeek (project architect at ZJA) says, “At Wijnegem ZJA designed not one but two new bridges to replace the old bridge. The new car bridge is low, so that the spatial and visual impact on the surroundings remains limited. With its gently arched girders and V-shaped supports, the bridge integrates seamlessly into the landscape. Preparatory work on the bridge for cyclists and pedestrians will start later this year.”
Smooth crossing with consideration for the environmentings
The car bridge crosses the canal ahead of the Wijnegem lock and has a span of 88 metres. With its horizontal shape and modest height, the bridge obstructs the view as little as possible. The V-shaped supports give optimal openness and there is space for cycle paths and a road along the canal. The abutments are laid on a stepped structure that will be planted up, for a friendly transition to the rural surroundings.
Further along the canal, a separate 175-metre bridge for cyclists and pedestrians will soon arise, long and graceful, with one foot elegantly resting on an extension of the lock complex. With the disappearance of the heavy old concrete bridge, the designers have also seized the chance to transform the space underneath from a dark underworld into a lighter, greener and more open environment.
More space for water-bone transport
Related
Bridges Turnhoutsebaan, Wijnegem
The design for the replacement of the bridge at Wijnegem, Belgium, by architectural studio ZJA consists of two bridges, one for cars and…
Pater Sangers bridge, Maaseik
Double-arch bridge
The Pater Sangers bridge at Maaseik is an elegant, double-arched bridge that merges together harmoniously in the middle of the river. With…
Elevated Lightrail System, South Korea
In the fall of 2018 the architectural studio ZJA welcomed a delegation of South Korean researchers, engineers and contractors that the…
Definitive contract for expansion of N206 Europaweg Leiden
The team of Boskalis, architectural studio ZJA and BoschSlabbers landscape architects has been given the definitive contract for the N206…